👷♀️ Greetings, Contrarian!
This is The Next Big Rush, your daily drop of mining and energy investing news. Where we come together and swap coffee tips and copper prices. 📝
📝 Here are the highlights
😎 Dragonfly Delivers
🧐 Gap Drilling Results
💪 Golden Saddle Hits
📌 Daily Commodity Prices

😎 Dragonfly Delivers
K2 Gold Corporation (TSX-V: KTO; OTCQX: KTGDF; FSE: 23K) reported results from the final four holes of first-phase drilling at its Mojave Project in California, United States.
Highlights:
83.82 metres of 3.40 g/t Au, including:
48.77 metres of 4.98 g/t Au.
19.81 metres of 7.58 g/t Au.
100.58 metres of 1.01 g/t Au, including:
6.10 metres of 4.60 g/t Au.
28.95 metres of 3.11 g/t Au, including:
9.15 metres of 8.53 g/t Au.
The Dragonfly Zone sits midway along the 6.5 km Eastside Gold Trend, with all 15 reported holes intersecting oxide gold mineralisation over approximately 240 metres of strike. Drilling is underway at the Newmont Zone, with assays pending for 27 holes.
🧐 Gap Drilling Results
Miata Metals Corp. (TSXV: MMET; FSE: 8NQ; OTCQX: MMETF) announced assay results from its Sela Creek Gold Project in Suriname.
Highlights:
43.0 metres of 2.42 g/t Au, including:
4.0 metres of 17.11 g/t Au.
25.6 metres of 1.96 g/t Au, including:
1.49 metres of 17.51 g/t Au.
14.1 metres of 2.23 g/t Au, including:
3.0 metres of 6.68 g/t Au.
Drilling between Jons Trend and Big Berg confirms a continuous 1.5 km mineralised corridor hosted in folded metasedimentary rocks, open along strike and at depth.
The 25,000 metre programme continues, testing high-grade zones to the southwest and extending strike length and depth.
💪 Golden Saddle Hits
White Gold Corp. (TSXV: WGO) (OTCQX: WHGOF) (FSE: 29W) revealed initial drill results from its White Gold Project in the Yukon, Canada.
Highlights:
38.08 metres of 1.47 g/t Au, including:
7.88 metres of 5.13 g/t Au
18.90 metres of 2.53 g/t Au
38.45 metres of 0.71 g/t Au, including:
6.18 metres of 1.14 g/t Au
Drilling extended the Golden Saddle high-grade core approximately 50 metres west and VG mineralisation to around 350 metres down-plunge, with all deposits open.
Assays are pending for 49 holes and results will feed into future resource updates.
📰 In Other News
🐦 Uranium Holds Ninety
Built for the unstoppable.
The Dell Pro powered by Intel® Core™ Ultra with Intel vPro® adjusts power usage based on how you work, so your battery life never slows you down.
How Are We Doing?
Happy Speculating!
The Editor
DISCLAIMER: None of this is financial advice. This newsletter is strictly educational and is not investment advice or a solicitation to buy or sell any assets or to make any financial decisions. Please be careful and do your own research.
Would you like to update how frequently you receive our emails? 📬







