- The Next Big Rush
- Posts
- ⛏️ AuRORA Levels Up
⛏️ AuRORA Levels Up
PLUS: Kwanika Hits
👷♀️ Greetings Contrarian!
This is The Next Big Rush, your daily drop of mining and energy investing news. Where we come together and go to the barber. 💈✂️
📝 Here are the highlights
💪 AuRORA Levels Up
👏 Kwanika Hits
🧐 Haldane Metals
📌 Daily Commodity Prices

Source: TradingEconomics and Numerco.
💪 AuRORA Levels Up
Amarc Resources Ltd. (TSXV: AHR | OTCQB: AXREF) reported drilling results at the AuRORA Deposit, Canada.
Highlights:
201 metres of 1.40 g/t Au, 0.28% Cu and 2.6 g/t Ag including:
32 metres of 1.65 g/t Au, 0.27% Cu and 2.0 g/t Ag and 94 metres of 2.08 g/t Au, 0.41% Cu and 3.4 g/t Ag.
201 metres of 1.38 g/t Au, 0.27% Cu and 1.6 g/t Ag including:
135 metres of 1.90 g/t Au, 0.30% Cu and 1.6 g/t Ag and 111 metres of 2.24 g/t Au, 0.34% Cu and 1.6 g/t Ag.
47 metres of 1.50 g/t Au, 0.44% Cu and 5.4 g/t Ag.
Drilling has expanded the high-grade AuRORA copper-gold-silver system by up to 300 metres into open areas to the north and east, highlighting continuity and growth potential.
Further assays from the 2025 program are pending.
👏 Kwanika Hits
NorthWest Copper (TSXV: NWST) announced new drilling results at its Kwanika Project in British Columbia, Canada.
Highlights:
58.0 metres of 0.96% copper and 1.04 g/t gold (1.92% CuEq) from 94 metres.
70.0 metres of 0.72% copper and 0.95 g/t gold (1.58% CuEq) from 52 metres.
40.5 metres of 0.27% copper and 1.02 g/t gold (1.19% CuEq) from 33 metres.
Recent drilling continues to expand high-grade near-surface mineralisation within Pit Zone 10, improving continuity and supporting the potential for a strong starter-pit scenario in future economic studies.
🧐 Haldane Metals
Silver North Resources (TSXV: SNAG | OTCQB: TARSF) reported drilling results at the Haldane Silver Property in the Keno District, Yukon, Canada.
Highlights:
14.40 metres of 231 g/t Ag, 0.24 g/t Au, 0.54% Pb and 0.39% Zn, including:
1.25 metres of 1,261 g/t Ag.
13.60 metres of 146 g/t Ag, 0.15 g/t Au, 2.34% Pb and 1.24% Zn, including:
1.20 metres of 467 g/t Ag.
Drilling has now extended the Main Fault mineralised structure an additional 50 metres along strike, totalling 100 metres on strike and 150 metres down-dip, with results still pending from two additional holes.
The strong silver grades and widening vein system support further aggressive drilling at Haldane in 2026.
📰 In Other News
🐦 Uranium Energy Momentum

How Are We Doing?Today's mining news was: |
Happy Speculating!
The Editor
DISCLAIMER: None of this is financial advice. This newsletter is strictly educational and is not investment advice or a solicitation to buy or sell any assets or to make any financial decisions. Please be careful and do your own research.
Would you like to update how frequently you receive our emails? 📬


Reply