- The Next Big Rush
- Posts
- ⛏️ Deck The Veins
⛏️ Deck The Veins
PLUS: Santa Brought Gold
👷♀️ Greetings Contrarian!
This is The Next Big Rush, your daily drop of mining and energy investing news. Where we come together and enjoy a good wine. 🍷
📝 Here are the highlights
😉 Deck The Veins
😍 Santa Brought Gold
🤩 Latin’s Holiday Targets
📌 Daily Commodity Prices

Source: TradingEconomics and Numerco.
😉 Deck The Veins
Aton Resources Inc. (TSXV: AAN) reported new drilling results from the Semna Project, Egypt.
Highlights:
25 metres of 3.65 g/t Au, including 3 metres of 11.92 g/t Au.
17 metres of 4.20 g/t Au, including 4 metres of 15.84 g/t Au.
5 metres of 10.62 g/t Au at depth.
The final Phase 3a RC results confirm strong continuity of gold mineralisation at depth and along strike at Semna, with multiple wide, high-grade quartz-vein zones supporting the potential for a significant orogenic gold system and further expansion beyond the main vein area.
😍 Santa Brought Gold
Dakota Gold Corp. (NYSE American: DC) reported new drilling results from its Richmond Hill oxide gold project, South Dakota, United States.
Highlights:
15.2 metres of 4.52 g/t Au, including 1.8 metres of 31.90 g/t Au.
30.2 metres of 1.43 g/t Au from expansion drilling north of the current resource boundary.
25.7 metres of 1.74 g/t Au, confirming continued mineralisation in the northeast area.
The results extend gold mineralisation up to 230 metres beyond the existing Measured and Indicated resource boundary, reinforcing resource growth potential at Richmond Hill, with numerous expansion and infill drill assays still pending from the 2025 drill campaign.
🤩 Latin’s Holiday Targets
Latin Metals Inc. (TSXV: LMS | OTCQB: LMSQF), sponsoring partner of TNBR, reported that option partner Daura Gold Corp. has commenced exploration activities at the Cerro Bayo gold–silver project in Santa Cruz Province, Argentina.
Highlights:
Induced polarisation (IP) surveys underway across priority structural corridors.
Geophysics to refine nine fully permitted drill targets.
Preparation in progress for a 1,500-metre initial drill program planned for early 2026.
The IP program is designed to improve targeting of low-sulphidation epithermal vein systems ahead of drilling, advancing Cerro Bayo toward first-pass drill testing while supporting Latin Metals’ prospect generator strategy.
📰 In Other News
🐦 Merry Tungsten Moves

How Are We Doing?Today's mining news was: |
Happy Speculating!
The Editor
DISCLAIMER: None of this is financial advice. This newsletter is strictly educational and is not investment advice or a solicitation to buy or sell any assets or to make any financial decisions. Please be careful and do your own research.
Would you like to update how frequently you receive our emails? 📬
Reply